LWT, LONDON

The existing floor had proved a success and had been in production constantly from the day it was laid. The operating surface had become damaged in places and although still performing well, it was decided that the floor would benefit from a general refurbishment.The refurbishment involved stripping the existing operating surface and laying the new reinforced Elgood Television Studio Finish. Requirements in addition to the high performance smooth floor necessary for camera tracking, were the reinstatement of the fire lanes and Camera Grid numeral references.
[…]

Read More… from LWT, LONDON