ELSTREE FILM STUDIOS STAGE 9
An installation by another contractor over December 2012 and January 2013 had failed.
Two months later the decision was made to remove the floor which was not fit for purpose.
Unfortunately the removal of the failed floor meant that some of the underlying screed and timber joists were damaged.
The weakened layer had to be lifted with care and reinstated. This increased the design thickness from 50mm to closer to 90mm.
Elgood Flooring were consulted by Elstree Film Studios Project team. […]